How much extra?

Concrete Waste Factor Calculator

The calculator adds a waste percentage to a base volume in cubic yards. Use it after the slab or driveway tool. The adjusted figure is still a quantity estimate, not a concrete order.

Base volume and waste

yd³
%
Five to ten percent is a common planning band for small flatwork. Zero is allowed if you want the geometric volume only.

Your estimate

Assumptions

The adjusted volume is the base yardage multiplied by one plus the waste percent divided by 100. Cubic feet equal that yardage times 27. A negative percent is rejected. A base volume of zero or less is rejected.

Waste is not a code requirement. It is a planning extra for an uneven subgrade, over-excavation, or the last of a chute. Ready-mix is often rounded to the next quarter yard at the plant. This tool does not apply that rounding unless you change the number yourself.